US Offshore Wind Project

US Offshore Wind Project

Scope

Port Captain Services

Year

2023, 2024 ongoing

Location

USA – New Bedford,MA

Codes & Standards

DNV-ST-N001 Marine operations and Marine Warranty; IMO CSS, USCG, OSHA

Facts

  • Representing OEM serving as primary interface between the Marshalling Contractor, T&I contractor, Feeder Barge Subcontractor 
  • Responsible for Feeder Barge Load Out and overseeing transfer of custody of WTG from OEM to T&I Contractor.
  • Total of 62 Feeder Barge Loadouts.
A large offshore wind turbine tower section stands vertically on a dock next to a red crane and other tower sections, with a specialized transport barge floating in the harbor. The sky is clear and calm.
Contact Us